On behalf of the Ministry of Water and Energy, Citiva Consult carried out the rural electrification of Ekoumeyeck, in the Ngomedzap municipality (Nyong-et-So'o division, Centre region), by extending an overhead single-phase HTA network.
Project Overview
On behalf of the Ministry of Water and Energy (MINEE), Citiva Consult carried out the rural electrification of Ekoumeyeck, a locality in the Ngomedzap municipality, in the Nyong-et-So'o division of the Centre region.
The project brought electricity to the locality by extending the existing medium-voltage (HTA) network with a new overhead single-phase line. This technical solution is well suited to rural areas: it allows the grid to reach communities that are some distance from existing lines at a cost compatible with the demand.
Rural electrification is one of Cameroon's development priorities. Access to electricity changes daily life: lighting for homes and schools, the ability to conserve food, to charge phones, to power small businesses and workshops.
Project gallery
04 photos



Context And Objectives
Before the project, Ekoumeyeck was not connected to the national grid. The objectives set by the Ministry were to:
- Connect the locality to the existing electricity network.
- Build a safe, durable installation compliant with the network operator's standards.
- Create the conditions for households and local activities to access electricity.
Scope Of Work
- Survey of the line route between the existing network and the locality.
- Extension of an overhead single-phase HTA network.
- Installation of poles and line equipment along the route.
- Stringing of conductors and installation of protection equipment.
- Connection of the new line to the existing grid.
- Checks and tests before energisation.
Our Approach
Surveying the route
The first step was to define the route of the new line, taking into account the terrain, access, vegetation and the location of homes. A well-chosen route reduces construction difficulties and makes future maintenance easier.
Building the line
Poles were set along the route and fitted with the necessary line equipment. Conductors were then strung and tensioned, and protection devices installed to secure the network.
Connecting to the grid
The new line was connected to the existing HTA network in line with the operator's technical requirements, ensuring that the installation integrates safely into the national grid.
Safety and compliance
Working on electrical networks requires strict safety procedures for the team and for the population. The works were carried out in line with the applicable technical standards, and checks were performed before the line was energised.
Results
- A new overhead single-phase HTA line connecting Ekoumeyeck to the national grid.
- A safe installation built to the network operator's standards.
- Access to electricity for the locality, supporting households, schools and local economic activity.
This project is part of Citiva Consult's commitment to infrastructure that makes a real difference in people's lives.